TÜRKÇE

Board of Directors




Murat ÇEÇEN
Chairman


CCN Holding Board of Directors’ Chairman Murat ÇEÇEN has been born in Ankara in 1971. He has graduated from Bilkent University Interior Architecture and Environmental Design department.Murat ÇEÇEN is also currently Board Member of IC Holding which is among the important companies of its sector specialized in airports, seaports, power plants, hotels and infrastructure and superstructure, DİA Holding FZCO, DİA Altyapı Yatırımları ve İnşaat, Bilkent Entegre Sağlık Hizmetleri ,Mersin Entegre Hastane Hizmetleri. Murat ÇEÇEN is married and the father of three children.





Mehmet Ali BAYAR
Board Member


CCN Holding Board of Directors’ Member Mehmet Ali BAYAR was born in İstanbul in 1962. BAYAR, who has completed his university education at the New York University Economy department, has also received his master’s degree from the same university. He has been very close to Mr. Demirel, during the periods when he was the prime minister and the president, and acted as foreign politics advisor. He has departed from his duty as the undersecretary at the Washington Embassy and has gone into politics. He has been the general president of the Democrat Turkey Party. Mehmet Ali BAYAR is married and the father of two children.




Murad BAYAR
Board Member

CCN Holding Board of Directors’ Member Mr. BAYAR was born in Sivas in 1965. Murad BAYAR, who has graduated from the Middle East Technical University Electrical Electronic Engineering, has received his master’s degree on Computer and Electronic Engineering from the North Carolina State University and MBA degree from Yale University. He has worked at the New York office of the Booz Allen Hamilton strategy consultancy company. Murad Bayar, who has worked as Defense Industry Undersecretariat in the public sector, is married and the father of two children.


PROJECTS


  • Baku Flame Towers<br/> Project
  • Heydar Aliyev <br />Center Project
  • Bilkent Integrated Health Campus Project
  • Mersin Integrated Healthcare
  • Sağlık<br>Bakanlığı
  • Shahdag Tourism Complex Project <br />(1st phase)
  • Shahdag Tourism Complex Project <br />(2st phase)
  • Baku Premium Villas Project
  • State Coast Facilities
  • Bilgeh Estate Project(1st phase)
  • Bilgeh Estate Project(2st phase)